References

 














 
Reference list - 2

Customer Country, location Material Functional specifications
Osiecznica PL Osiecznica Silica sand

Engineering:
· Executional planning for storing
  and loading wet sand
· Feasibilty analysis for the
  extension of a wet processing
  plant
Engineering and plant construction
· Semi-mobile crushing station
  with crusher, screening machine,
  weighing bridge, control,
  foundations and steel construction
Engineering:
· Kaolin processing and extension
  of drying plant
· Pipe line planning for a wet   processing plant incl. water   management
· Wet processing and screening
  plant

Wacker D Burghausen Dolomite, lime Vanadium slag Fluorspar, lime aluminate

Engineering and plant construction
· 5 truck discharging station
· 3 pneumatic pressure conveying
  plant

Brillux D Malsch

Mica, Precal, Sipernat, Silica sand

Engineering and plant construction
· Silo plant for finished products
  with steel construction,   pneumatic conveying plant, 6   aeration devices
· 8 System Hermanns aeration
  devices for silo 3.600 mm
· Renewal of silo truck discharging

B.U.S Metall GmbH D Duisburg

Steel works dust,
Coke breeze,
used sand,
Lump coke,
Used adsorbent

Plant construction:
· Extension of silo plant with 2
  silos and batching devices
· 1 pneum. suction conveying plant
· Rotary troughed conveyor belt
· Extension of silo truck
  discharging station
· 1 pneumatic pressure
  conveying plant
· Silo plant, steel construction,
  façade
· 5-truck discharging station
· 1 UCS discharging station
· 2 pneumatic pressure conveying
  plants

Heitkamp
BVG
D Herne / Berlin

Special cement

Engineering and plant construction
· Open bunker with discharging
  screw and proportioning pump,
  steel construction
· Control
· Planing and construction
  time: 2 weeks

Staphan Schmidt D Dornburg -
Langendern-
bach

Clay granules

Engineering and plant construction:
· Silo, metering screw,
  steel construction
· Control

Bernhard Jacob D Völklingen -
Ludweiler

Refractory materials

Engineering and plant construction:
· Conversion of a pneumatic
  tandem conveying plant to a
  full-flow conveying system
· Complete renewal of pneumatic
  conveying plant

SK Šajdíkové
Humence
Silica sand Engineering:
· Feasibility analysis for plant
  extensionsn
SamQuarz ZA Delmas Silica sand

Engineering for technical equipment and load-bearing structure planning
· Plant extension: First crushing
  stage, wet processing,
  cyclone dumps, screening plant
· Pipe line planning
· New quarz sand processing plant

 